Conveyer Systems
Our company supplies installations of conveyer systems in manufacturing plants, power stations, refuse incinerating plants… Assembly of machinery is carried out on the basis of drawing documentation provided by a customer and supplied conveyer components.
Types of conveyers installed by our company:
- belt conveyers
- piping conveyers
- chain conveyers
- elevators
- roll conveyers
- overhead chain conveyers
- worm conveyers
Technological Equipment
Our activities include also installation of various technological equipment, such as:
- air capacitors
- cooling towers
- assembly of low-pressure piping (marginally)
- hardening furnaces for insulating boards
References – list of some relized assembly jobs in the field of conveyer systems and technological equipment
- the system of the belt conveyors, transporf of the gypsun, cement factory Práchovice (year 1999)
- mouting of the technology and transport of the MBM, silos the rendering plant Věž (year 2000 – 2003)
- the systém of the belt conveyors, transport of the coal, Orsil Častolovice (in 2000)
- the system of the overhead chain coveyors 9,5km, Philips Hranice na Moravě (year 2001 – 2002)
- assembly of the technological pletforms and paint booths IVECO Vysoké Mýto (year 2002)
- assembly of the the ship unloaders for cement and grain for the Dutch company de Rujter (year 2003 – 2007)
- instalation of the conveying equipment to transport paper bags, Austria, Italy, Holland, France, Greece, Spain (year 2003 – 2006)
- assembly of the air condenser, Heating plant Plzeň (year 2004)
- assembly of the curing furnace, Saint Gobain Orange France (year 2005)
- disassemly and reassembly of the solidification line, Koramo Kolín (year 2005)
- the system of the belt conveyors , Precheza Přerov (year 2005)
- assembly of the curing furnace, Isover Runcorn England (year 2006)
- disassembly of the conveyor system and foundry device foundry Lucern Swiss (year 2006), the foundry Mencl Guss Roudnice nad Labem (year 20007 – 2008)
- assembly of the curing furnace, Knauf Moscow Russia (year 2006)
- assembly of the curing furnace, Saint Gobain Forsa Finland (year 2007)
- assembly of the curing furnace, Saint Gobain Azuqueca Spain year 2007)
- exchange stirrers alkalis, Mondi Štětí (year 2007 – 2010)
- instalation of the curing furnace, Saint Gobain Chemille France (year 2008)
- assembling of the air condenser and steam pipeline Incinerator Liberec (year 2009)
- installation of the gas coolers, Velké Kapušana Slovakia (year 2009)
- installation of the cooling towers, US Steel Košice, Slovnaft Bratislava, Dalkia Žiar nad Hronom Slovakia, Hamburger Dunaujváros Hungary (year 2009 – 2015)
- installation of the conveyor systém desulphurisation, Power plant Ledvice (year 2010 – 2012)
- installation of the lines for pellets, Liesno Belarus (year 2012)
- system of the conveyors , SAS Plazy (year 2013 – 2015)
- reconstruction of the conveyor equipment, Limeworks Čertovy schody Tmáň (year 2015)
- installation of the over head conveyors, Magna Nymburk CZ, Magna Nizhny Novgorod (year 2015 – 2017)
- assembly of the over head runways, Slaughterhouse Zeman Příbram (year 2016)
- Repairs of scrapers and conveyor equipment, Cemex Prachovice (2019 – 2021)
- Assembly of belt conveyors, flexovels, elevators, Porfix Trutnov, Ostrava (2004 – 2021)
-
Disassembly of the old packaging line and assembly of the new packaging line LB Cemix Čebín (2021)